Discussion on:

3
Comments

Join the conversation!

Follow via:
RSS
0 Votes
+ -
Typo's?
David, the quote from Grunwald says they "expected 40 GW of wind power by 2030" and "it's not quite 2030 yet and we've already got 50 GW". That would make a whole lot more sense if you (or Grunwald) meant 2013.
Posted by riverat1
Updated - 13th Aug
0 Votes
+ -
Wind policy? What a joke.
All of the turbines in Massachusetts that were paid for with stimulus money have been shut down for over 14 months with major design and construction flaws. At best half of them will be working by years end. The rest will be running by 2013.

And these are not the only problems. That is 1 state.

Great policy. NOT.
Posted by Hates Idiots
11th Aug
0 Votes
+ -
Advice from Oregon
You need to consult some Oregon wind farmers. Here we have over 2,500 MW of wind power installed providing 8.2% of the electricity generated in Oregon in 2011. Another 845 MW is scheduled to come on line by the end of 2012.
Posted by riverat1
13th Aug
Join the conversation
Formatting +
BB Codes - Note: HTML is not supported in forums
  • [b] Bold [/b]
  • [i] Italic [/i]
  • [u] Underline [/u]
  • [s] Strikethrough [/s]
  • [q] "Quote" [/q]
  • [ol][*] 1. Ordered List [/ol]
  • [ul][*] · Unordered List [/ul]
  • [pre] Preformat [/pre]
  • [quote] "Blockquote" [/quote]

Join the SmartPlanet community and join the conversation! Signing up is fast and free. Don't wait -- we want to hear your opinion!